0
Like
The pre shutdown refractory inspections give a good picture of the status of the refractory, which allows most of the maintenance to be determined before the stop. This will result in a more accurate and faster maintenance schedule.
Specification Title | Specification Description |
---|---|
Areas of Application
|
Petro industry and waste to energy.
|
Capabilities
|
Inspections high temperatures | Optimize combustion processes
|
Certifications / licences
|
ISO 9001 / VCA petrochemistry.
|
In-service inspection possible
|
Yes
|
Inspection
|
Detailed 4K shots over a long distance.
|
Temperature
|
Max. 1400 C
|
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[9/9]
Sign up or log in to your Explorer Plus or higher plan to get access to all the 4 deployment references.
Last Deployment Year