Vibrojet®
A silent method for installing offshore wind turbine foundations
With the advance of 10+ MW wind turbines and increasingly strict noise standards, the existing pile-driving method with hydraulic hammers for monopiles is under high pressure.
Extra measures are needed such as bubble screens or a wall around the monopile. They are expensive and time consuming to install. The pile is also damaged by the hydraulic hammer, which means that larger piles are needed than actually necessary.
GBM Works has developed the Vibrojet®, a machine to install monopiles in a silent and fast way. The Vibrojet® is not only less harmful to marine life and cheaper, the process is also kept strictly under control and requires less power generation.
Specification Title | Specification Description |
---|---|
Areas of Application
|
Offshore | Nearshore
|
Vibrating
|
Vibrating the pile at the tip, avoiding loss of energy through the length of the pile
|
Installation
|
Vibrojet installation technology of GBM Works proves to install 2x deeper and 4x faster
|
Efficiency
|
Significant reduction in sound emission and fatigue can be expected using the Jet-gun of the Vibrojet
|
Water injection
|
Controlled water injection on the inside of a pile, fluidizing the soil resulting in zero resistance
|
Reviews
Sign up or log in to get access to the reviews written about this technology.
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[5/9]
Relative Business Impact
Sign up or log in to your Explorer Plus or higher plan to get access to all the 1 deployment references.
Last Deployment YearTotal DeploymentsComment