Pipe Clamping Mattresses

0 Reviews
0 Followers
1 Deploy

Step-change in arresting pipeline walking

Page last modified
April 11 2024

Developed by Subcon in cooperation with Shell Global Solutions (Shell), the engineered 'pipe clamping mattress' (PCM) is used to mitigate pipeline-walking.

With rock-dumping the vast majority of load is passed straight to the seabed, but with PCMs 100% of the load is effective in mobilizing axial resistance.

The technique was first developed on Shell's Malampaya Project; as an alternative to traditional rock dumping.  Shell presented a technical paper on the Malampaya PCM’s at the Houston OTC available here

Pros & Limitations
1
Rock Dumping Alternative - Addressing pipeline-walking with PCMs rather than rock-dumping also eliminates the need for fall-pipe vessel and competent rock
1
Eliminates Suction Pile – using a ‘wait-and-see’ philosophy for pipeline walking, eliminates suction pile fabrication and installation | As pipeline-walking is an uncommon and slow process, remediation can be achieved using post-installed PCMs
1
Design Efficiency - With rock-dumping the vast majority of load is passed straight to the seabed but with PCMs 100% of the load is effective in mobilizing axial resistance
0
Intellectual Property - Shell has a US patent pending for the PCM, but has now released the PCM option to the market via a global licensing agreement with Subcon
Specification
Specification Title Specification Description
Accuracy
Clamping tolerance ~1mm (client issued pipeline to make the mould).
Areas of Application
Pipeline Walking Mitigation or Rectification.
Installation
PCMs can be installed as a pair (with the log mat) thus halving the installation time.
Lifespan
50 years
Material
Fibre reinforced concrete with neoprene lining.
Modular design
PCMs are deployed in banks determined by total restraining capacity.
Patents
Shell has a US patent pending for the PCM, but has now released the PCM option to the market via a global licensing agreement with Subcon. 
Response time
PCMs can be designed, fabricated and installed in circa 4 months (thereby suitable for a wait-and-see approached where pipeline walking is reacted to).

Reviews

Get access to reviews

to your explorer or platform subscription to get access to the reviews written about this technology.

Technology Readiness Level

The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.

[9/9]

Development Technology demonstration Mature / Proven
Ask the supplier
 to contact this technology supplier.

Subcon is a global leader in subsea stabilisation and marine foundations.  We have also pioneered Engineered Integrated Reefs which have recently been used in Oil & Gas for a ‘Rigs to Reefs’ Decommissioning solution.

 With offices in the Netherlands, Belgium, Singapore, Australia and China we provide a local service backed by our international expertise.

Relative Business Impact

Solution Deployed By
Company Name

to your explorer or higher plan to get access to all the 1 deployment references.

Last Deployment YearTotal DeploymentsComment