Removing mud residues/deposits behind sand screens
Challenge Overview
Well OperationsProduction TechnologyOil
Description
We have a well with a minimum ID of 2.650". The well is completed with sand screens with pre-drilled base pipe. We suspect that poor mud quality from drilling phase might have introduced debris behind the screens which is affecting production. 4" screens.
The production from the well is much lower than expected. Debris behind screens is main theory, but has not been confirmed. Looking for Intervention solution to remove the suspected debris.
Location where the technology is required
Norway
Published
Equinor
Submit Solution / Ask Question
Share your solution directly with the challenge owner. TechnologyCatalogue.com is providing this as a service to the challenge owner, there are no fees/commission payments for solutions submitted.